Checklist · Lehigh Acres facts
The FDOT project list and the Lee County MPO plan show road work that may affect your trip
- Source
- swflroads.com
- Checked
- November 2026
- Written by
- Editorial team
The state's project list names an SR 82 Intersection Safety Improvements project, and it opens with a travel alert banner [1]. The Lee County MPO plan explains how road projects are chosen over the next 25 years [2].
Quick answers
- The FDOT project list includes SR 82 Intersection Safety Improvements, project number 000005-2 [1].
- The list page opens with an FDOT Emergency Travel Alert that points to a separate Alerts page [1].
- The Lee County MPO long range plan is a 25-year vision that covers drivers, bicyclists, pedestrians, transit riders and freight [2].
- The MPO urges community members to get involved, and its public meeting dates are posted online [3].
The FDOT project list names SR 82 Intersection Safety Improvements
The list includes a project called SR 82 Intersection Safety Improvements, numbered 000005-2 [1]. The title tells you the work is about safety improvements at intersections [1].
- Open the FDOT project list and read the alert banner at the top first [1].
- Use the filters to narrow the list. The choices include All Current Projects, Construction Projects, Future Projects, Design Projects, Planning Projects and Completed Projects [1].
- Find SR 82 Intersection Safety Improvements, number 000005-2 [1].
- Scan for other roads on your route. The list also names SR 70, SR 776, US 41, US 27 and several I-75 projects [1].
- Move through the pages, because the list runs across 10 pages [1].
The FDOT Emergency Travel Alert directs you to the current situation
The project list page opens with an FDOT Emergency Travel Alert [1]. It asks you to visit the Alerts page for information on the current situation [1]. The banner text does not describe the situation itself, so you have to open the alert to find out [1].
Check that alert before you leave for an appointment, because the banner at the top of the list page is the notice FDOT chose to place there [1].
The Lee County MPO long range plan looks 25 years ahead at every way of travel
The Long Range Transportation Plan is the Lee County MPO's 25-year vision for the community's transportation needs [2]. MPO stands for Metropolitan Planning Organization. It is a federally mandated and funded board of representatives from local government and transportation providers [2]. The board guides how federal transportation funding is applied in Lee County [2].
The plan covers drivers and passengers, bicyclists, pedestrians, people using public transportation, and freight movement [2]. It also sorts which needs can be paid for with federal, state and local money [2].
- Goal 1 aims to make the system safer and more secure for motorized and non-motorized users [2].
- Goal 2 aims to give residents, visitors and businesses meaningful transportation choices [2].
- Goal 6 aims to manage congestion, connect the different ways of travel, and make the system more reliable [2].
The 2050 plan began in 2024 and was approved by the MPO Board on December 12, 2025 [2]. Updates come every five years, and data collection for the next version has started [2].
The Lee County MPO website lists public meetings and posts news of an FDOT hearing
The MPO says decisions made now are shaping Lee County's transportation future, and it urges everyone in the community to take part [3]. The MPO's news posts an FDOT Draft Tentative Work Program Public Hearing running December 7 through December 11 [3]. The Work Program Snapshot for that draft was not yet available for review when the MPO posted its news [3].
| Meeting | Date and place |
|---|---|
| Bicycle Pedestrian Coordinating Committee | December 1, 2026, 10:00 am to 12:00 pm, Fort Myers [3] |
| Technical Advisory Committee | January 7, 2027, 9:30 am to 11:30 am, Cape Coral [3] |
| Citizen Advisory Committee | January 7, 2027, 3:00 pm to 5:00 pm, Cape Coral [3] |
| Traffic Management and Operations Committee | January 13, 2027, 10:00 am to 12:00 pm, Fort Myers [3] |
| MPO Executive Committee | January 13, 2027, 1:30 pm to 3:30 pm, Cape Coral [3] |
The Citizen Advisory Committee is made up of local citizens appointed by MPO Board members [3]. The Technical Advisory Committee is local and state agency planners, engineers and transit operators [3].
If you need special accommodations or free translation, the MPO asks you to contact it at least seven days before the meeting [3].
The FDOT planning offices supply projects to the state Work Program
Florida's population growth increases demand on the state's transportation system [4]. FDOT responds with investments in capacity and travel options meant to improve safety, reduce congestion and move people and goods more efficiently [4].
The Chief Planner leads FDOT's Central Office Planning Offices, including Policy Planning, Systems Forecasting and Trends, and Systems Implementation [4]. These offices work with federal, state and local partners and supply the Work Program with projects [4]. The draft Work Program is the subject of the FDOT public hearing that the MPO's news posted for December [3][4].
RefSources attached
| No. | Document | Issued by |
|---|---|---|
| 1 | All Projects | swflroads.com |
| 2 | Long Range Transportation Plan (LRTP) | leempo.com |
| 3 | Lee County MPO | leempo.com |
| 4 | FDOT Office of Chief Planner | fdot.gov |